New building of P.Stradiņa Hospital

Customer  Veselibas ministrija
Contractor  SBRE
Works
 gaisa kondicionēšana
Site area, m2
 30000
Cooling Capacity   2000
Execution period
 2016

The first phase of the new building of Pauls Stradins Clinical University Hospital is scheduled to be completed in 2016. The total area of the new A block in the first phase of the project will be 30,438 square meters together with lower ground floor.

The Company BIANT signed a contract for the installation of the building’s refrigeration supply systems. The total refrigerating power of the chillers that are located in the energy unit “Carrier” is about 2.0 mW. More than 350 fan coil units are planned to be installed in the wards and medical treatment room to maintain the microclimate.